Reorder Point Calculator
Find the stock level at which to reorder: expected demand while you wait for the supplier, plus the safety stock you choose, with the method for that safety stock shown.
Assumptions
- Average demand and lead time hold roughly steady, and both are in the same time unit.
- Statistical safety stock additionally assumes demand and lead time vary independently and roughly follow a normal distribution, and that the standard deviations you enter describe that variation.
Limitations
- A reorder point does not guarantee stock: a demand spike or a late delivery larger than the safety stock can still cause a stockout.
- Standard deviations from a short or seasonal history are unreliable; the statistical method is only as good as those inputs.
- It does not decide how much to order; see the EOQ and stock coverage calculators.
How this is calculated
- Reorder point = average demand per time unit × lead time + safety stock.
- Statistical safety stock = z × √(lead time × demand variance + demand² × lead-time variance), where z is the standard-normal value for your service level (90% = 1.2816, 95% = 1.6449, 97.5% = 1.9600, 99% = 2.3263, 99.5% = 2.5758).
Results are estimates for planning purposes and are not legal, tax, investment, or accounting advice.