Job Profitability Calculator

Job Profitability Calculator

Add up what a job really cost, see its profit and margin on a clearly named basis, test cost overruns, and compare the cost with what you quoted.

Jurisdiction: global ยท For: contractors and tradespeople, agencies and service businesses

The job

Before sales tax. Example: 12000

Job costs

Example: 80

What an hour of work costs you including employer costs and benefits, not the wage alone. The Labor Cost Calculator can work it out. Example: 38

Example: 3200

Example: 1500

Example: 250

Hire or the job's share of equipment cost. Example: 400

Example: 150

Permits, warranty set-aside, anything else caused by this job. Example: 100

Overhead and contingency

Example: 8

A contingency is counted as a cost.

Example: 300

How to measure it

These are different measures. Contribution shows what the job adds towards your overheads; fully loaded shows what is left after a share of them.

How much higher the costs might turn out.

The total cost in your quote or estimate, on the same basis as above (with or without overhead). Gives the difference between quoted and actual cost. Example: 6800

Assumptions

  • The costs you enter are the actual (or best current) costs of the job, all incurred on it, in one currency and before sales tax.
  • Allocated overhead is a share you choose, not a measured cost of the job.

Limitations

  • Contribution profit and fully loaded profit answer different questions; compare each only with itself.
  • Unrecorded time and costs make jobs look more profitable than they were; the result is only as complete as the costs you enter.
  • A planning estimate, not accounting advice.
How this is calculated
  • Direct cost = labor hours ร— labor rate + materials + subcontractors + travel + equipment + disposal + other. Contribution cost = direct + contingency. Fully loaded cost = contribution cost + overhead. Profit = revenue โˆ’ the chosen cost. Margin = profit รท revenue.
  • Overrun: profit = revenue โˆ’ cost ร— (1 + overrun). Cost increase that wipes out the profit = revenue รท cost โˆ’ 1. Variance = cost on the chosen basis โˆ’ quoted cost.

Results are estimates for planning purposes and are not legal, tax, investment, or accounting advice.

Share this calculator (the page only, not your numbers): Email Facebook X LinkedIn WhatsApp
Report an issue

Please do not include passwords or confidential business details.

Optional. Numbers, dates and choices are sent and stored with your report; free-text fields are left out. Site administrators can see them.